Verifying and validating environmental data: why it takes more than one step

Before environmental data is used or published, it goes through more than one check. Here is why it pays to separate the roles and keep a record of every decision.

A value measured in the field or in a laboratory is not reliable data straight away. Before it is compared with limits, included in a report or shown to the public, someone has to check that it is correct, complete and consistent with the rest of the series.

Two different checks

In practice there are two distinct moments. Verification is a technical check made close to where the data is produced: units, transcription, completeness of the sheet, and consistency with the stated instruments and methods.

Validation is a later judgement on verified data: is the value plausible compared with earlier measurements, other stations and the conditions of the survey? This is the step that makes the data usable.

ISPRA’s guidelines on quality assurance for air quality monitoring networks use the definitions of the International Vocabulary of Metrology: verification establishes that data meets specified requirements, validation that those requirements are adequate for the intended use. For projects subject to environmental impact assessment (EIA, VIA in Italy), the ministerial guidelines on monitoring plans ask for the plan to set out its quality control and validation methods, and to collect the validation rules in an operating protocol stating the roles and responsibilities of each person involved.

Why separate the roles

When the same person enters, checks and approves data, mistakes are more likely to slip through. Separating whoever produces the data from whoever verifies it and whoever validates it is a simple, effective cross-check.

Reversibility matters too: a check with a negative outcome should be able to send the data back with a reason, without deleting it.

A record of every decision

Months later, or during an inspection by the authority, you need to be able to reconstruct who verified and validated a value, and when. A log of status changes answers that question without digging through email.

The same sources say so explicitly: procedures must make every operation traceable and state the responsibilities of each party, and an anomaly must be recorded with its date, place and the people involved.

Example with made-up data

Example: checking a PM10 value

A station called ATM_01 records a daily PM10 value of 412 on a sheet that gives the unit as mg/m³. The station and the value are made up, only to show the two checks.

Verification: whoever produced the data notices that the instrument exports values in µg/m³ and corrects the unit. They then check that the valid hours of the day meet the coverage required by the plan and that the method is the one in the protocol, and record who made the correction and when.

Validation: later on, the validator compares 412 µg/m³ with the same station’s pre-construction values, with other stations on the same day and with the site diary. If nothing explains the value, it is handled as an anomaly to be confirmed, for example by measuring again or checking the instrument, as the guidelines describe.

Sources

  1. Linee Guida per la predisposizione del Progetto di Monitoraggio Ambientale (PMA) delle opere soggette a procedure di VIA – Indirizzi metodologici generali (Capitoli 1-2-3-4-5)(opens in a new tab)
    Ministero dell’Ambiente (MATTM), ISPRA, MiBACT, Rev.1, 16/06/2014, sections 5.1 (p. 16) and 5.4, points 2, 3, 5 and 7 (pp. 21-23); in Italian.
  2. Linee guida per le attività di assicurazione/controllo qualità (QA/QC) per le reti di monitoraggio per la qualità dell’aria ambiente (Manuali e Linee Guida 108/2014)(opens in a new tab)
    ISPRA, 2014, section 5 (p. 16) and glossary (p. 66); covers air quality networks; in Italian.

Let’s look at your monitoring data together

In a demo we walk you through the platform using a case similar to yours: matrices, stations, the validation workflow and the map. Then we work out together how to set it up for your project.