How R3Ambiente works
The platform mirrors the structure of an environmental monitoring plan (EMP): every record has a defined place, a person responsible for it and a status, from pre-construction to post-construction.
How the data is organised
Information runs from the general to the specific, just like a monitoring plan.
An example
Project
Port expansion, lot 2
The work or construction lot being monitored. Users are assigned to projects and only see the ones they are responsible for.
Matrix
Marine and coastal waters
The environmental component being monitored, such as air, water or noise. Each matrix has its own parameters and survey sheets.
Station
MC-03, east quay
The measuring point or transect, with code, coordinates, municipality, locality and attached documents.
Survey
14 Oct 2026, construction phase
A single measurement campaign, with date, operator, instrument, phase (pre-construction, construction, post-construction) and parameter values.
Environmental matrices
Each matrix has its own survey sheets and parameters. For every project you switch on only the matrices your monitoring plan requires.
- Air
- Air quality and weather data, with dedicated survey sheets.
- Marine and coastal waters
- Measurement campaigns and continuously acquired data, with thresholds per parameter.
- Surface water
- Rivers and other surface water bodies, recorded with the watercourse.
- Groundwater
- Groundwater and aquifer monitoring.
- Noise and vibration
- Noise and vibration surveys, by station type.
- Ecosystems
- Birds, bats, mammals, reptiles and amphibians, flora, vegetation, habitats and more, including along transects.
- Marine biocoenoses
- Marine communities such as seagrass beds, macrobenthos and Pinna nobilis.
- Soil and subsoil
- Soil analyses with reference limits.
- Excavated soil and rock
- Characterisation of excavated earth and rock.
- Landscape and physical state
- Surveys and photographic records.
- Radiation
- Stations and surveys, with their documentation.
- Agronomy
- Agronomic surveys and reports.
Which matrices are available depends on how the project is set up. For landscape, radiation and agronomy the platform manages surveys and documentation without measurement tables.
The review workflow
Surveys and documents follow the same five-status path. The actions available depend on the role of the person signed in.
In progress
Creates stations and surveys, by hand or by importing Excel and CSV files, attaches documents and requests verification.
Verification requested
Checks the survey. If it is correct it moves on to validation; if not, it goes back to the operator.
Validation requested
Reviews the verified data and either validates it or rejects it: a negative outcome sends the record back to the operator, in progress.
Validated
The data has passed its checks and can be viewed, read-only, by authorised users and supervisory bodies. If the project has a public portal, validated stations and surveys for the matrices made public appear there from this point.
Published
The publisher records the publication of validated data. For documents, this is the step that makes them downloadable from the public portal. Publication can be withdrawn: the record goes back to “Validated”.
- 1In progressOperator
- 2Verification requestedVerifier
- 3Validation requestedValidator
- 4ValidatedValidator
- 5PublishedPublisher
Negative outcome
History
- OperatorVerification requested2 Oct
- VerifierVerification approved3 Oct
- ValidatorNegative outcome5 Oct
- OperatorVerification requested again6 Oct
- VerifierVerification approved7 Oct
- ValidatorValidated8 Oct
- PublisherPublished9 Oct
Public portal
- MC-01 · Marine and coastal waters
- RUM-02 · Noise and vibration
- PZ-03 · Groundwater
Negative outcome
A negative outcome, at verification or validation, sends the record back to “In progress”, with the reason if one is given: the operator corrects it and requests verification again.
History and reminders
Every step stays in the survey’s history. Each day, people with records waiting for them get a summary email.
Verification when the deadline passes
If switched on, a verification request left waiting beyond the set number of days is treated as verified and the record moves to “Validation requested”. The step stays in the history, marked as automatic. It is not a validation: the validator still has to act.
Roles and permissions
The predefined roles cover the typical responsibilities in a monitoring programme. Every workflow action needs the matching permission: the administrator can adjust each role’s permissions, and access is also restricted by project and matrix.
- Operator
- Enters and imports data for their own matrix and requests verification.
- Verifier
- Verifies surveys with a positive or negative outcome.
- Validator
- Validates or rejects verified data.
- Publisher
- Publishes validated data or withdraws publication.
- Supervisor
- Sees all data in their projects without taking part in the workflow.
- Viewer
- Read-only access to validated data.
- Supervisory body
- Read-only, with a validator’s visibility: sees data from the moment validation is requested (awaiting validation, validated and published) and every map layer.
- Administrator
- Manages users, parameters, lookup tables and reference documentation.
From validation to publication
Validated data can be shown on a public portal that is separate from the restricted area, for the matrices the project makes public. Documents appear there once they are published.
- A home page with a summary per matrix and the date of the latest publication
- Public map, station list and survey details
- Visibility set per matrix
- Download of public documents
Environmental monitoring
Port expansion
- Published stations
- 51
- Matrices with data
- 6
- Latest published survey
- 21 Oct 2026
How it is delivered
Web application
Runs in the browser, in the office or on site, with nothing to install.
Cloud SaaS service
OFFLINE Agency runs the infrastructure, the updates and document storage. Data stays in Italy, on cloud infrastructure qualified by the Italian National Cybersecurity Agency (ACN). There is nothing to install and no servers to maintain.
Configured per project
Matrices, parameters, limits, users and public visibility are set up to match your monitoring plan.
Let’s look at your monitoring data together
In a demo we walk you through the platform using a case similar to yours: matrices, stations, the validation workflow and the map. Then we work out together how to set it up for your project.