Roads, railways and major works

Works subject to Environmental Impact Assessment (EIA) require a monitoring plan that crosses different areas and runs for years. R3Ambiente organises monitoring by project or lot and by phase, so every survey stays linked to the stretch and the stage of the works it refers to.

Construction machinery working on a new motorway carriageway

The challenges

  • Several lots, several teams

    Each construction lot has its own site and often its own monitoring team, but the data has to remain comparable.

  • Three phases to compare

    Pre-construction, construction and post-construction surveys must be kept apart and comparable over time.

  • Many environmental components

    Ten or more matrices are followed together along the route, each with its own parameters and measurement frequencies.

How R3Ambiente helps

  • Organised by lot

    Users are assigned to the lots they are responsible for and only see those. There are also sections for the operating programme, completed activities and construction progress.

  • A phase on every survey

    Pre-construction, construction and post-construction is a required field on every survey and a filter in every list.

  • One sheet per matrix

    Every matrix in the plan has its own survey sheets and parameters, in the same archive: the typical matrices are listed below.

How it works

Typical matrices

Which matrices are available depends on how the project is set up.For landscape, radiation and agronomy the platform manages surveys and documentation without measurement tables.

  • Air
  • Surface water
  • Groundwater
  • Soil and subsoil
  • Excavated soil and rock
  • Noise and vibration
  • Ecosystems
  • Landscape and physical state
  • Radiation
  • Agronomy
  • All matrices

All industries

Let’s look at your monitoring data together

In a demo we walk you through the platform using a case similar to yours: matrices, stations, the validation workflow and the map. Then we work out together how to set it up for your project.